Illustrative scenario · Acme — 60-person product org

Acme adopts a draft-then-approve sprint plan

A scenario for a product org whose sprint planning has outgrown one Scrum Master: what to turn on, in what order, and which numbers tell you whether it worked.

Team
60 people across 6 squads
Cadence
Two-week sprints, shared backlog per squad
Existing tooling
CSV export from the previous tracker

Acme is a fictitious team. This is not a customer story and contains no result figures or attributed quotes. What it does contain is real: every route below exists in the product, and every measure states where its number is computed.

Where it starts

  • Planning takes a full day per squad and still ships over-committed sprints.
  • One Scrum Master covers three squads, so two of them plan without one.
  • Estimates are carried over from the last sprint whether or not they were right.
  • Nobody can say which squads are over-loaded until the sprint already slipped.

What to turn on, in order

Order matters — each step assumes the one before it is already in place.

  1. 1

    Import the backlog before anything else

    The CSV importer maps columns onto the real task fields — status, priority, story points, assignee, sprint and due date. Planning quality is bounded by import quality, so this comes first and the importer reports rows it could not place.

  2. 2

    Record capacity and skills per member

    The draft plan reads open load, recent completed points, recorded meeting and PTO pressure, and the skills on each member's profile. Missing any of those produces a plan that looks confident and is not.

  3. 3

    Turn on the draft plan for one squad

    The AI Scrum Master produces a draft with a plain-language rationale per suggested task. Nothing reaches the board until a human accepts it, and accepting writes through the same task and sprint endpoints a manual edit uses — so the activity log and notifications look identical either way.

  4. 4

    Set sprint goals the draft can be measured against

    Goals give the health score something to compare against beyond raw throughput. Without them the gauge only tells you whether tasks moved.

  5. 5

    Subscribe the right people to the right events

    Notifications are per-user and per-type. Squad leads get draft-ready and slipped-item alerts; the rest of the org does not.

  6. 6

    Run the retrospective against the actuals

    Retros compare the committed plan with what shipped. That comparison is the feedback loop that makes the next draft better — skipping it leaves the plan learning nothing.

What to watch

No target values. Each row says where the number is computed and what feeds it, so you can decide what good looks like on your own data.

Measures and where each one is computed
MeasureWhere the number comes from
Planning time per squadWall-clock time in the planning meeting, recorded by the squad. JiraVision does not time your meetings.
Committed versus completed pointsComputed on /dashboard/sprints from the task rows in each sprint — the same numbers the burndown lines plot.
Draft acceptance rateAccepted versus dismissed recommendations, on /dashboard/ai-scrum-master. Dismissals keep their reason, so a low rate is diagnosable rather than mysterious.
Load spread across the squadThe workload-distribution indicator on /dashboard/ethical-metrics, which prints its own formula and exclusions when you open the card.

Walk this scenario on your own workspace

Every route above is live. The fit quiz will tell you which of these scenarios is closest to your team before you start.