Skip to content
JiraVision
Solutions · Startups
14-day trial, no card

Your whole delivery plan is in two people's heads. Move one of them onto paper

At startup size there's no PM, no EM bench, no capacity model — there's a founder, a small team, and a shared gut feeling about 'this week'. JiraVision turns that gut feeling into a defensible draft before the sprint, so pace doesn't quietly become debt.

  • First sprint draft in about an afternoon of setup
  • Load warnings that arrive before the burnout, not the resignation
  • Per-seat pricing that starts small — live numbers on /pricing

The problem

Speed at startup size has a hidden invoice

Moving fast is the correct strategy until it turns into a habit of saying yes without doing the arithmetic. The invoice arrives as slipped releases, a blown-out teammate, and an investor asking what happened to the roadmap.

01

Every yes is a silent no

Five things fit in the sprint on Monday; a demo request kills two of them by Wednesday. Nobody wrote the trade-off down, so nobody owns the outcome.

02

Four hats, zero recognition

The one senior engineer is also the reviewer, the on-call, the interview loop and the docs. Context-switching doesn't appear in any tool — until they leave.

03

The tool tax compounds

A planning tool, a survey tool, a metrics suite — each priced for someone bigger than you, each half-used by month three. Startups pay for enterprise features in triplicate.

What you get

A delivery brain, freelance

Everything here is sized for a team of five to twenty-five: quick to set up, cheap to quit, honest about what it is.

Drafts, not process

The AI Scrum Master writes the sprint proposal with per-item rationale. You didn't hire a PM; you don't need a ceremony. Review, edit, approve.

The trade-off gets written down

When the demo displaces the migration work, the draft says so. Investor-facing predictability built on decisions with receipts.

Hat-counting for real

Reviews, interviews and firefighting show up in load views and skill trees — so the generalist hero is visible before they're invisible in a resignation.

Numbers that survive diligence

Every metric opens to its formula and source events. When someone asks how you knew, the card answers — no dashboard theatre.

One subscription, not three

Planning, wellbeing signals, recognition and metrics ship together, priced per seat. You can start on the smallest tier — see /pricing.

An afternoon, not a quarter

Connect Jira, keep your board, get the first draft before standup. No consultants, no migration, nothing to undo if you leave.

01

Founder-led planning, without the founder bottleneck

You're the roadmap, the sales call and the release manager. The draft plan arrives before Monday — sized to who's actually about, with the reasoning written next to each item — so your job shrinks to editing and approving. When the team asks 'why does this wait, and this ship?', the draft answered before anyone had to interrupt you to find out.

  • Sprint proposal waiting before planning, every cycle
  • Every item carries its why — readable at 9am or 9pm
  • You approve; the board is never touched without you
A small startup team planning together around a laptop

02

The pace that doesn't compound quietly

Overtime at a startup is culturally invisible — everyone's 'all in'. That's exactly why the numbers matter: after-hours trends and load distribution show when speed has become a loan, two or three weeks before it becomes a resignation letter. Early warning is the whole product; you decide what to protect.

  • Crunch visible as drift, not drama
  • Answers aggregated — nobody's manager gets a timesheet
  • Recovery weeks are a suggestion with a playbook attached
Laptops and notebooks on a busy small-team desk

03

Buy once. Cancel cheaply. Keep the receipts.

Priced per seat, so ten people cost like ten people — the tiers start small and the current numbers live on /pricing. The trial needs no card, setup is an afternoon, and if you outgrow or lose interest, your data exports with you. The planning rationales and metric history you built are yours either way; that's the point of showing your working.

  • Per-seat plans that scale when you hire, not when a rep says so
  • Annual billing option on /pricing — no surprise line items
  • Export or delete workspace data at any time
An engineer at a workbench with tools and a laptop

How it works

An afternoon from signup to first draft

The trial exists precisely so you can test the whole loop before it costs you anything.

  1. Step 1

    Connect your Jira project

    Read-only. Keep your board, your workflow, your habits — JiraVision reads what's already there.

  2. Step 2

    Read the first draft

    Items with rationale, capacity that knows your real availability. Argue with the reasoning, not with a blank plan.

  3. Step 3

    Approve and get on with it

    A human approves every plan — that's the architecture, not a setting. Then nobody re-asks what slipped and why.

  4. Step 4

    Check the trend monthly

    Predictability, load spread and after-hours drift with formulas on the cards. Pace you can prove, or pace you can fix.

Straight talk

Be honest about the fit

Works well if

  • Teams of roughly 5–25 shipping product in Jira with no dedicated PM or EM bench
  • Founders who want their roadmap promises defensible with receipts, not vibes
  • Post-Series-A teams feeling the tool tax and the first real burnout risk

Not for teams that

  • Pre-product teams without a Jira board yet — there's nothing to connect; the trial will bore you
  • Anyone hunting for project management autopilot: every plan needs your approval, by design
  • Teams needing GitHub/GitLab-native today — roadmap, labelled planned; ask us at /contact

Who it's for

Who's actually holding the plan

In a startup that's usually three people, sometimes the same person twice.

Founders and tech leads

The roadmap lives in your head and your calendar. It gets written down, defended with evidence, and stops requiring your presence to be understood.

  • Draft before every sprint
  • Trade-offs in writing
  • Numbers for the next investor call

Early employees wearing many hats

The review-menting-on-call-docs generalist finally shows up as loaded — visibly to the team, before it shows up as burnout.

  • Hat-swapping counted
  • Load caps honoured in drafts
  • Care work recognised, opt-in

Ops and finance on the founders' side

One per-seat line instead of three half-used tools, with a trial that ends cleanly if the answer's no.

  • No card to trial
  • Scales down as easily as up
  • Your data leaves with you

No black boxes

What 'built for startups' actually means

The mechanics behind the pitch, including the numbers we won't restate here.

Setup cost
One read-only Jira connection and default thresholds. First draft lands the same day; there is no migration, training programme or onboarding fee.
Pricing shape
Per-seat tiers with a 14-day no-card trial, and an annual option that saves money. Exact current prices live on /pricing — we point there instead of quoting them.
Exit cost
Zero contractual lock. Export the workspace or delete it, and the sprint rationales plus metric history stay legible outside JiraVision.
What it is not
Not a timesheet, not CRM, not a hiring tool, and not therapy — a workload tool with receipts. Some things we say we don't build, and mean it.

Included in every plan

This product ships with the platform — Starter, Professional and Enterprise all include it. Pricing scales by seat, annual billing saves 20%.

What early teams say

“First time in two years our sprint plan existed before Monday. It read like an engineer wrote it overnight. It didn't — but it had done the maths.”
Early-access participant — CTO and co-founder — Seed-stage devtools startup
“The after-hours trend made us stop bragging about crunch weeks. That was uncomfortable and it saved one of my engineers.”
Early-access participant — Founding engineer — AI startup, six people

Example quotes from early-access conversations. We publish attributed testimonials only with permission.

Shipped

Recent updates for this product

  1. 2026-10-23

    Feature

    AI sprint reports

    Capacity-aware sprint drafts now ship with a written rationale per suggested item, so planning decisions can be reviewed and edited before approval.

  2. 2026-06-10

    Feature

    JiraVision goes public

    Initial launch: AI Scrum Master, Team Wellbeing, Gamification and Ethical Metrics for teams connecting Jira workspaces.

Full changelog

FAQ

Questions founders ask

All questions

Try it on one real sprint

The no-card 14-day trial exists for exactly this: connect your board, approve (or reject) one real draft, and see the load picture before it costs you a teammate.